Photo update: September 30, 2006...A lot of work has been done on the villas last month. Most of the fireplaces are finished. Tilings are done on most interior and exterior surfaces. Stone walls around pools are beign built, as You can see on the following photographs.
Each villa will be surrounded by a traditional stone wall, with a gate for a garage access and a door for entering the property.